Is plug-in solar legal in California?
SB 868 (Wiener) was approved by the Governor on September 30, 2026 and chaptered as Chapter 985, Statutes of 2026; it adds Chapter 13 (commencing with § 8530) to Division 4.1 of the Public Utilities Code and takes effect January 1, 2027. The cap is a maximum aggregated AC output of not more than 1,200 W per dwelling. The utility protections are written to operate until January 1, 2030, and beginning January 1, 2030 the sale of plug-in devices that do not meet the statutory definition is prohibited. The act contains no landlord, tenant or HOA provisions. As of late 2026, no complete kit yet held the whole-system certification the definition requires.
StatusLaw passed — not yet in effect
LawSB 868 (Chapter 985, Statutes of 2026)
Effective dateJanuary 1, 2027
System size cap1,200 W
OutletDesigned to be connected to and disconnected from a building's electrical system through a receptacle; the statute does not specify a plug type or voltage
Certification requirementMust be certified as a plug-in photovoltaic system by Underwriters Laboratories or an equivalent nationally recognized testing laboratory (whole-system certification, i.e. to UL 3700), and meet the standards of the most recent National Electrical Code and the California Electrical Code
InterconnectionExempt from all interconnection requirements imposed by state law, the Public Utilities Commission, electrical corporation rules, or local publicly owned electric utility rules; the exemption provisions operate until January 1, 2030
Utility rulesAn electrical corporation or local publicly owned electric utility may not require approval or charge any fee or charge related to the device; it may require the customer to notify it, using a simple online registration form, of the address, make, model, and size of the device
What this means for you
Use the legality checker to combine this state's rules with a specific product and your renter/homeowner status. Remember that a state law is only half of the answer — the product's UL 3700 certification status is the other half.
Sources (last checked 2026-11-23):
General information, not legal advice. Confirm against the statute text and your utility's current guidance.