Is plug-in solar legal in Connecticut?

Connecticut's plug-in solar rules are Section 9 of Public Act 26-127 (HB 5340), signed June 4, 2026 and effective October 1, 2026. Not more than one device may be used behind a customer's electric meter, with a maximum power output of 1,200 W; the act does not state whether the cap is measured as AC inverter output or DC panel rating. The device must carry a consumer warning that generation exported beyond on-site use may be charged as usage unless the customer has a meter that allows net metering. The act contains no landlord or HOA provisions, so leases and association rules still apply, and building and fire codes are not exempted.

StatusLaw in effect
LawPublic Act 26-127 (HB 5340), Sec. 9
Effective dateOctober 1, 2026
System size cap1,200 W
OutletStandard 120-volt AC outlet located behind the customer's electric meter; the device must not be permanently affixed to a structure
Certification requirementMust be certified by Underwriters Laboratories or an equivalent nationally recognized testing laboratory and meet UL 1741 (Connecticut names the UL 1741 inverter standard, not UL 3700), the National Electrical Code, IEEE 1547, and the State Building Code
InterconnectionExempt from interconnection agreement requirements imposed by Public Utilities Regulatory Authority regulations or decisions, provided not more than one device is used behind a customer's electric meter; the act requires no utility notification
Utility rulesNo electric distribution company shall require a customer to obtain the company's approval before installing or using the system, pay any fee or charge related to the system, or install any additional controls or equipment beyond what is integrated into the system

What this means for you

Use the legality checker to combine this state's rules with a specific product and your renter/homeowner status. Remember that a state law is only half of the answer — the product's UL 3700 certification status is the other half.

Sources (last checked 2026-11-23):

General information, not legal advice. Confirm against the statute text and your utility's current guidance.